Rear-Side Drone Inspections

Find the faults that are keeping you up at night.

Connectors, junction boxes and cable runs sit under the modules, out of view of a standard aerial survey. A low, automated flight along the back of each row brings them into frame, so your team can act on failing components before they cost generation or become a safety risk. For asset managers, it adds the rear of the array to the same SolarGain record as your other surveys.

What we detect

Thermal anomalies

Hot connectors

Overheating connections between modules and along strings, pinpointed on the site map.

Hot junction boxes

Heat build-up at the module junction box, backed by thermal and visual imagery.

Also detected

Cable management

Loose, sagging or damaged cable runs.

Structual anomalies

Visible issues with the mounting structure.

Vegetation

Growth reaching above the bottom edge of the modules.

Rear glass and backsheet

In evaluation - scope agreed site by site.

What we detect

Hot connectors

Overheating connections between modules and along strings, pinpointed on the site map.

Hot junction boxes

Heat build-up at the module junction box, backed by thermal and visual imagery.

Cable management

Loose, sagging or damaged cable runs.

Structural anomalies

Visible issues with the mounting structure.

Vegetation

Growth reaching above the bottom edge of the modules.

Rear glass and backsheet

In evaluation - scope agreed site by site.

Step 2

Rear-side flight

Our trained partner flies an automated route behind each row, around 2 m above the module tops, slowly enough for sharp imagery.

Step 1

Site setup survey

We build an elevation model of the site, so we can fly safely close to the modules.

Step 3

Findings delivered in SolarGain

Our analysts review every image. Thermal findings arrive as a thermographic survey, visual issues as pinned observations, ready to assign as tasks to your O&M team.

How it works

Full service

Conditions for best results

The following conditions are needed for the best rear-side drone inspection results:

Single-module (1P) tracker sites

A clear, sunny day

Rows held at full stow during the flight

A starting area under 5 MW

Morning or afternoon sun
e.g. 08:00–11:00 or 14:00–17:00 in summer

Timelines and deliverables are agreed project by project.

Simply email info@abovesurveying.com to get started

Ready to price your next rear-side job?

Just email us with your project details and we’ll get back to you as soon as possible.